W10-15P Rough Crossing — Plaque
Adds a ROUGH CROSSING warning to a grade-crossing approach.
- Sign Name
- Rough Crossing — Plaque
- MUTCD Code
- W10-15P
- Sign Category
- Warning Signs
Specifications
- Shape
- Rectangle (Horizontal)
- Color / legend
- Black legend and border on yellow background
Sizes & Dimensions (inches)
These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.
Use California Table 8B-1 and its notes for roadway selection; pathway/sidewalk applications also reference Table 9A-1. Federal drawing sizes do not establish California installation minimums.
- Official drawing size30" × 24"
- Official drawing size36" × 30"
California Application & Variants
The ROUGH CROSSING plaque supplements crossing warning signs under section 8B.25. The legend does not specify an advisory speed.
Size selection: Use California Table 8B-1 and its notes for roadway selection; pathway/sidewalk applications also reference Table 9A-1. Federal drawing sizes do not establish California installation minimums.
When & Where It's Used
- Railroad or light rail crossing review
Placement Context
- Where it sits
- The ROUGH CROSSING plaque supplements crossing warning signs under section 8B.25. The legend does not specify an advisory speed..
- CA MUTCD reference
- CA MUTCD 2026 §8B.25
Related Signs
Browse Warning SignsEducational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.
Need to Rent or Purchase This Sign? Contact Public Ready.
Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.