MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource

R7-111a No Parking Except Electric Vehicles (Part-Time)

Reserves the indicated parking spaces for electric vehicles during the posted hours.

Sign Name
No Parking Except Electric Vehicles (Part-Time)
MUTCD Code
R7-111a
Sign Category
Regulatory Signs

Specifications

Shape
Rectangle (Vertical)
Color / legend
Red legend and border on white background

Sizes & Dimensions (inches)

These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.

Dimensions checked against the exact official drawing. Select by the applicable roadway or bicycle-facility requirements; displayed hours, fees, and other variable legends are examples.

  • Official drawing size12" × 18"
View dimensions and source

California Application & Variants

Use the actual restricted hours. Parking reserved for electric vehicles is distinct from parking reserved for active charging.

When & Where It's Used

  • Parking-zone and curb-use review

Placement Context

Where it sits
At the designated parking space, zone, or payment station; use arrows and sign orientation appropriate to the limits of the regulation..
CA MUTCD reference
CA MUTCD 2026 §2B.53

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.