MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource

R2-11 End Double Fines Zone — California Legend

Marks the downstream end of the applicable designated double-fines zone.

Sign Name
End Double Fines Zone — California Legend
MUTCD Code
R2-11
California designation
Federal sign with a California layout variant
Sign Category
Regulatory Signs

Specifications

Shape
Rectangle (Vertical)
Color / legend
Black legend and border on white background

Sizes & Dimensions (inches)

These sizes are listed in the linked California MUTCD table. Use the applicable roadway column and confirm the approved design and fabrication details with the roadway authority.

Sign face extracted from the adopted California manual figure; sizes from Table 2B-1. No dimensioned fabrication drawing is offered for this entry. Check road-type columns in the source table.

  • CA MUTCD Table 2B-124" × 30"
  • CA MUTCD Table 2B-130" × 36"
  • CA MUTCD Table 2B-136" × 48"
  • CA MUTCD Table 2B-148" × 60"
View dimensions and source

California Application & Variants

California Figure 2B-3 replaces HIGHER with DOUBLE under the same R2-11 designation. Coordinate this termination sign with the applicable beginning sign or plaque.

When & Where It's Used

  • Regulatory signing review

Placement Context

Where it sits
California Figure 2B-3 replaces HIGHER with DOUBLE under the same R2-11 designation. Coordinate this termination sign with the applicable beginning sign or plaque..
CA MUTCD reference
CA MUTCD 2026 §2B.25

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.