W3-9 · Traffic Using Shoulder
W3-9 Sizes & Dimensions
These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum. All dimensions below are in inches.
Open W3-9 Official Dimension Drawing (PDF, opens in a new tab)Official PDF · Opens in a new tab
Dimensions from the Official Drawing
Dimensions verified against the official drawing. Diamond dimensions are nominal side lengths. Select the required application size from the California manual, not simply the smallest available drawing.
- Official drawing size36" × 48"
Select using the applicable California sign-size table and actual roadway.
The smallest drawing size is not necessarily the permitted application size.
- Official drawing size48" × 60"
Select using the applicable California sign-size table and actual roadway.
The smallest drawing size is not necessarily the permitted application size.
Drawing dimensions are not a universal minimum or an agency approval. These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.
California Application & Variants
Use on the relevant ramp approach where part-time shoulder travel is allowed, or on an applicable stop- or yield-controlled conventional-road approach. The displayed hours and days are examples; use the actual shoulder-operation schedule. California also provides BUSES USING SHOULDER W130(CA); the two legends are not interchangeable for every operation.
Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.
Need to Rent or Purchase This Sign? Contact Public Ready.
Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.