MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource

W13-12 Advisory Exit Speed (Truck Rollover)

Combines an exit advisory speed with a truck-rollover warning.

Sign Name
Advisory Exit Speed (Truck Rollover)
MUTCD Code
W13-12
Sign Category
Warning Signs

Specifications

Shape
Rectangle (Vertical)
Color / legend
Black legend and border on yellow background

Sizes & Dimensions (inches)

These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.

Dimensions verified against the linked official drawing. Diamond dimensions are nominal side lengths. Select the required application size from the California manual and agency requirements; do not assume the smallest drawing size is permitted.

  • Official drawing size24" × 42"
  • Official drawing size36" × 66"
  • Official drawing size48" × 84"
View dimensions and source

California Application & Variants

The original left-oriented example and sample speed are illustrative. Use for the applicable tip-over condition near the gore under section 2C.12, with an engineering-based advisory speed and matching direction.

When & Where It's Used

  • Roadway condition and warning-sign review

Placement Context

Where it sits
Select placement using the actual approach, sight distance, applicable California manual provisions, and responsible agency requirements..
CA MUTCD reference
CA MUTCD 2026 §2C.12

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers - with expert support built for compliance.