MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource
W1-7 Two-Direction Large Arrow — sign artwork

W1-7 TWO-DIRECTION LARGE ARROW Requirements

Application notes for W1-7 TWO-DIRECTION LARGE ARROW. The official manual distinguishes mandatory standards, recommended guidance, and optional applications; consult the linked sources for the provisions that apply.

California Application & Variants

Install on the far side of the T-intersection facing the stem approach. Do not use to mark median ends or center piers. California recommends an OM1-3 object marker below it on the same post.

1. When TWO-DIRECTION LARGE ARROW Is Used

Indicates that the roadway ends at a T-intersection with travel available to either side.

  • Roadway geometry and approach-warning review

2. Placement and Application Notes

Position W1-7 far side of a T-intersection, facing traffic approaching from the stem..

  • Place the sign where the intended road users have a clear, unobstructed view on approach.
  • Use the mounting height and lateral placement specified for the sign and installation type.
  • Use sign assemblies and supplemental plaques only as provided in the applicable manual and approved design.

3. Layout Sizes and Visibility Considerations

Linked-layout dimensions: 24" × 12"; 36" × 18"; 48" × 24"; 60" × 30". Check the applicable MUTCD and agency requirements for the required installation size.

  • Choose size based on roadway speed, sight distance, and mounting location.
  • Use the visibility and material requirements specified for this sign and installation.

4. Sign Selection Checks

  • Match W1-7 and its orientation to the actual roadway condition.
  • Install on the far side of the T-intersection facing the stem approach. Do not use to mark median ends or center piers. California recommends an OM1-3 object marker below it on the same post.
  • Select size and installation using the applicable California table and responsible agency requirements.

Related Resources

Browse All Sign Series

Verify W1-7 Requirements

This is an educational reference. Verify sign use, size, placement, and application against the current CA MUTCD, Caltrans sign specifications, Standard Plans, and the reviewing agency. Official source links are gathered in one place.

View official sources

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.