MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource
R4-4 Begin Right Turn Lane Yield to Bikes — sign artwork

R4-4 BEGIN RIGHT TURN LANE YIELD TO BIKES Requirements

Application notes for R4-4 BEGIN RIGHT TURN LANE YIELD TO BIKES. The official manual distinguishes mandatory standards, recommended guidance, and optional applications; consult the linked sources for the provisions that apply.

California Application & Variants

Do not use for a right-turn lane-drop situation where bicyclists need to move left. Review the actual bicycle and motor-vehicle paths.

1. When BEGIN RIGHT TURN LANE YIELD TO BIKES Is Used

Advises motorists and bicyclists of a weave where motorists enter a mandatory right-turn lane across a bicycle lane.

  • Regulatory signing review

2. Placement and Application Notes

Position R4-4 do not use for a right-turn lane-drop situation where bicyclists need to move left. Review the actual bicycle and motor-vehicle paths..

  • Place the sign where the intended road users have a clear, unobstructed view on approach.
  • Use the mounting height and lateral placement specified for the sign and installation type.
  • Use sign assemblies and supplemental plaques only as provided in the applicable manual and approved design.

3. Layout Sizes and Visibility Considerations

Linked-layout dimensions: 36" × 30". Check the applicable MUTCD and agency requirements for the required installation size.

  • Choose size based on roadway speed, sight distance, and mounting location.
  • Use the visibility and material requirements specified for this sign and installation.

4. Sign Selection Checks

  • Match R4-4 and its displayed legend to the intended condition.
  • Check the source drawing for the required directional or message variant.

Related Resources

Browse All Sign Series

Verify R4-4 Requirements

This is an educational reference. Verify sign use, size, placement, and application against the current CA MUTCD, Caltrans sign specifications, Standard Plans, and the reviewing agency. Official source links are gathered in one place.

View official sources

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.