
This guide summarizes the MUTCD requirements and practical application guidance for the R3-5L LEFT TURN ONLY sign. Use this resource to understand when it is required, how to place it correctly, and how to maintain clear visibility for safe operations.
Requiring a left turn from a designated lane at an approach
At the point where the regulation applies, per CA MUTCD Part 2B.
Mount at the standard height and setback for the roadway with clear sight lines.
High reflectivity and clear sight lines are essential day and night.
Requires drivers in this lane or approach to turn left, using a curved left-turn arrow over the ONLY legend. It prohibits any other movement from that lane.
Requires drivers in this lane or approach to turn left, using a curved left-turn arrow over the ONLY legend. It prohibits any other movement from that lane. In the field, R3-5L Left Turn Only is typically positioned at the advance warning area, ahead of the work. Common deployments include requiring a left turn from a designated lane at an approach; mandatory movement lane-use control in and around work zones; restricting through and right movements from the lane. Always confirm its size, retroreflective sheeting, spacing, and placement against the CA MUTCD 2026 and the reviewing agency before finalizing the traffic control plan.
At the point where the regulation applies, per CA MUTCD Part 2B.
Typical minimum: 30" × 36"; 24" × 30" minimum on low-speed roadways.
Used in California per the CA MUTCD as a mandatory movement lane-control sign requiring a left turn from the lane. Confirm its size, retroreflective sheeting, placement, and spacing against the CA MUTCD 2026 and the reviewing agency before finalizing the traffic control plan.
Go to California NotesEducational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Written against California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition. Official sources last verified June 2026.
Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.