
R10-8 USE LANE WITH GREEN ARROW Requirements
Application notes for R10-8 USE LANE WITH GREEN ARROW. The official manual distinguishes mandatory standards, recommended guidance, and optional applications; consult the linked sources for the provisions that apply.
1. When USE LANE WITH GREEN ARROW Is Used
Directs road users to the lane indicated by a green lane-use control arrow.
- Lane-use control
2. Placement and Application Notes
Position R10-8 use to supplement lane-use control signals under the applicable lane-control provisions..
- Place the sign where the intended road users have a clear, unobstructed view on approach.
- Use the mounting height and lateral placement specified for the sign and installation type.
- Use sign assemblies and supplemental plaques only as provided in the applicable manual and approved design.
3. Layout Sizes and Visibility Considerations
Linked-layout dimensions: 30" × 36"; 36" × 42"; 60" × 72". Check the applicable MUTCD and agency requirements for the required installation size.
- Choose size based on roadway speed, sight distance, and mounting location.
- Use the visibility and material requirements specified for this sign and installation.
4. Sign Selection Checks
- Match R10-8 and its displayed legend to the intended condition.
- Check the source drawing for the required directional or message variant.
Related Resources
Browse All Sign SeriesVerify R10-8 Requirements
This is an educational reference. Verify sign use, size, placement, and application against the current CA MUTCD, Caltrans sign specifications, Standard Plans, and the reviewing agency. Official source links are gathered in one place.
View official sourcesEducational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.
Need to Rent or Purchase This Sign? Contact Public Ready.
Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.