
R10-40a · Bicycle Signal — Mandatory Through Movement
R10-40a Sizes & Dimensions
These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum. All dimensions below are in inches.
Open R10-40a Official Dimension Drawing (PDF, opens in a new tab)Official PDF · Opens in a new tab
Dimensions from the Official Drawing
Match this mandatory-through design to the signal operation; optional-movement designs use different arrows.
- Drawing size 112" × 21"
Select using the applicable MUTCD size table and roadway authority requirements.
Overall dimensions in the linked FHWA drawing; not a universal minimum.
- Drawing size 224" × 36"
Select using the applicable MUTCD size table and roadway authority requirements.
Overall dimensions in the linked FHWA drawing; not a universal minimum.
Drawing dimensions are not a universal minimum or an agency approval. These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.
Official References
- CA MUTCD 2026 §9B.22 (opens in a new tab)
- FHWA Standard Highway Signs — Release 2 official vector and layout archive (opens in a new tab)
- California MUTCD (Caltrans) (opens in a new tab)
- Federal MUTCD — 11th Edition (FHWA) (opens in a new tab)
- Caltrans Sign Charts (opens in a new tab)
- FHWA Standard Highway Signs (opens in a new tab)
Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.
Need to Rent or Purchase This Sign? Contact Public Ready.
Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.