MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource
R10-11 No Turn on Red — sign artwork

R10-11 · No Turn on Red

R10-11 Sizes & Dimensions

These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum. All dimensions below are in inches.

Open R10-11 Official Dimension Drawing (PDF, opens in a new tab)

Official PDF · Opens in a new tab

Dimensions from the Official Drawing

Confirm the regulated movement, visibility, and any time restrictions. This word-message design is distinct from R10-11a and R10-11b.

  • Drawing size 124" × 30"

    Select using the applicable MUTCD size table and roadway authority requirements.

    Overall dimensions shown on the linked official drawing; not a universal minimum.

  • Drawing size 236" × 48"

    Select using the applicable MUTCD size table and roadway authority requirements.

    Overall dimensions shown on the linked official drawing; not a universal minimum.

Drawing dimensions are not a universal minimum or an agency approval. These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.