MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource
OM4-2 Object Marker Type 4 — sign artwork

OM4-2 OBJECT MARKER TYPE 4 Requirements

Application notes for OM4-2 OBJECT MARKER TYPE 4. The official manual distinguishes mandatory standards, recommended guidance, and optional applications; consult the linked sources for the provisions that apply.

1. When OBJECT MARKER TYPE 4 Is Used

An end-of-roadway marker using red reflectors on a black diamond-shaped panel. It identifies the end of the traveled roadway.

2. Placement and Application Notes

Position OM4-2 at the end of the roadway, per CA MUTCD Chapter 2C.

  • Place the sign where the intended road users have a clear, unobstructed view on approach.
  • Use the mounting height and lateral placement specified for the sign and installation type.
  • Use sign assemblies and supplemental plaques only as provided in the applicable manual and approved design.

3. Layout Sizes and Visibility Considerations

Linked-layout dimensions: 18" × 18". Check the applicable MUTCD and agency requirements for the required installation size.

  • Choose size based on roadway speed, sight distance, and mounting location.
  • Use the visibility and material requirements specified for this sign and installation.

4. Sign Selection Checks

  • Match OM4-2 and its displayed legend to the intended condition.
  • Check the source drawing for the required directional or message variant.
  • Select the marker type and, for striped markers, the side on which traffic passes.

Related Resources

Browse All Sign Series

Verify OM4-2 Requirements

This is an educational reference. Verify sign use, size, placement, and application against the current CA MUTCD, Caltrans sign specifications, Standard Plans, and the reviewing agency. Official source links are gathered in one place.

View official sources

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.