This guide summarizes the MUTCD requirements and practical application guidance for the M4-8 DETOUR sign. Use this resource to understand when it is required, how to place it correctly, and how to maintain clear visibility for safe operations.
Marking the detour route around a closure
Along the detour route at each decision point.
Mount at the standard height and setback for the roadway with clear sight lines.
High reflectivity and clear sight lines are essential day and night.
Identifies an approved detour route, marking the path drivers should follow around a closure when used with directional arrows.
Identifies an approved detour route, marking the path drivers should follow around a closure when used with directional arrows. In the field, M4-8 Detour is typically positioned at the along the detour route at each decision point. Common deployments include marking the detour route around a closure; mounted with M4-9 directional arrows at decision points; used with W20-2 DETOUR AHEAD advance warning. Always confirm its size, retroreflective sheeting, spacing, and placement against the CA MUTCD 2026 and the reviewing agency before finalizing the traffic control plan.
Along the detour route at each decision point.
Typical minimum: 24" × 12" (route marker / plaque).
Used in California to mark a detour around a closed road or lane, mounted above or with directional arrow markers to guide each turn.
Go to California NotesEducational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Written against California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition. Official sources last verified June 2026.