MUTCD Sign ChartMUTCDSignChartA Public Ready Knowledge Resource
G58P(CA) Next Right (Auxiliary Sign) — sign artwork

G58P(CA) · Next Right (Auxiliary Sign)

G58P(CA) Sizes & Dimensions

These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum. All dimensions below are in inches.

Open G58P(CA) Official Dimension Drawing (PDF, opens in a new tab)

Official PDF · Opens in a new tab

Dimensions from the Official Drawing

These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.

  • Layout size30" × 24"

    See layout variant and applicable MUTCD size-selection requirements.

    Dimensions transcribed from the linked layout; no roadway minimum is inferred.

Drawing dimensions are not a universal minimum or an agency approval. These are dimensions shown on the linked layout. Select the required size using the applicable MUTCD and agency requirements; the smallest drawing size is not necessarily the permitted minimum.

California Application & Variants

The drawing permits NEXT RIGHT, NEXT LEFT and NEXT EXIT, with color combinations specified on the sheet. The illustrated message and background are examples; match the plaque to its parent sign and application.

Permitted messages

  • NEXT RIGHT
  • NEXT LEFT
  • NEXT EXIT

Educational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Reference editions: California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition with Revision 1.

Need to Rent or Purchase This Sign? Contact Public Ready.

Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.