D9-7 Gas
The D9-7 Gas is a California MUTCD guide & destination sign. Verified line-by-line against the official FHWA Standard Highway Signs (SHS) 2024 drawing (FHWA SHS 2024 Release 6 - Guide Signs (2/10/2026), PDF page 92 (sheet 4-132)), which titles the sign “Gas”. Colors per the official sheet: LEGEND, BORDER — WHITE (RETROREFLECTIVE); BACKGROUND — BLUE (RETROREFLECTIVE).
- Sign Name
- Gas
- General Meaning
- The D9-7 Gas is a California MUTCD guide & destination sign.
- MUTCD Code
- D9-7
- Typical Use
- At the decision point, junction, or service location the sign serves, per CA MUTCD Part 2 and Caltrans placement standards.
- Sign Category
- Guide & Destination Signs
Specifications
- Standard Shape
- Rectangle (Horizontal)
- Background Color
- Blue
- Legend / Symbol
- White legend
- Border
- White
- Reflectivity
- High Intensity (for nighttime visibility)
- Compliance
- MUTCD / CA MUTCD
Standard Sizes (inches)
- Conventional Rectangle (Horizontal)24"–48" tall
- Expressway Rectangle (Horizontal)36"–60" tall
- Freeway Rectangle (Horizontal)48"–72" tall
Material / Application Notes
Applied per the CA MUTCD and Caltrans sign specifications. Confirm placement and supplemental plaques against the applicable CA MUTCD standard.
View this sign on the Federal MUTCD (FHWA)California Notes
California-specific application notes and adoptions may differ. Review California requirements where applicable.

What It Means / When This Sign Is Used
In the field, D9-7 Gas is typically positioned at the advance warning area, ahead of the work. Common deployments include applied per the CA MUTCD and Caltrans sign specifications; selected and sized for the roadway type and setting; coordinated with the overall signing plan and permit. Always confirm its size, retroreflective sheeting, spacing, and placement against the CA MUTCD 2026 and the reviewing agency before finalizing the traffic control plan.
Learn more about Gas sign requirementsWhen & Where It's Used
- Applied per the CA MUTCD and Caltrans sign specifications
- Selected and sized for the roadway type and setting
- Coordinated with the overall signing plan and permit
Placement on a Traffic Control Plan
- Where it sits
- At the decision point, junction, or service location the sign serves, per CA MUTCD Part 2 and Caltrans placement standards.
- CA MUTCD reference
- CA MUTCD Part 2, Chapters 2D–2K (Guide and Motorist Services Signs)
- Typical minimum size
- Size varies with legend length and roadway class; set letter height, spacing, and border per the Caltrans Sign Specifications
California / Field Use Notes
Used in California per the CA MUTCD; the federal drawing is FHWA Standard Highway Signs (SHS) 2024 (FHWA SHS 2024 Release 6 - Guide Signs (2/10/2026), PDF page 92 (sheet 4-132)). Confirm size, retroreflective sheeting, and placement for the condition and the reviewing agency.
In Los Angeles, this sign must conform to the CA MUTCD. Work in City of LA right-of-way is reviewed by StreetsLA and the Bureau of Engineering; state highways in LA County are permitted by Caltrans District 7; county roads by LA County DPW.
Common Plan Review Comments
- Official drawing: FHWA Standard Highway Signs (SHS) 2024 (FHWA SHS 2024 Release 6 - Guide Signs (2/10/2026), PDF page 92 (sheet 4-132)).
- Verify size for the roadway classification and setting.
- Confirm retroreflective sheeting class per the CA MUTCD.
- Verify placement and mounting height per the CA MUTCD.
Verified against the FHWA SHS 2024 drawing for D9-7. Confirm size and placement for the condition. Public Ready can review sign selection against your plan and agency requirements.
Related Signs
View All D-Series SignsEducational reference only. This is not an official Caltrans, FHWA, or local agency publication and is not legal or engineering advice. Always verify sign selection, size, placement, spacing, and application against the current CA MUTCD 2026, Caltrans sign specifications, Standard Plans, project documents, and the reviewing agency’s requirements. Local jurisdictions may impose additional requirements, and final selection, placement, and dimensions may require engineering judgment or agency approval. Written against California MUTCD 2026 (effective January 18, 2026) and the Federal MUTCD 11th Edition. Official sources last verified June 2026.
Need to Rent or Purchase This Sign? Contact Public Ready.
Public Ready supports sign selection, project-ready sign packages, and equipment sourcing through qualified providers — with expert support built for compliance.